SEPTICHOW · HOMEOWNER KNOW-HOW

Septic Drain Field Size Calculator: Flow & Soil Loading

Estimate absorption area and trench length from design flow, trench width and the approved soil loading rate.

Enter site evaluation details

Free to use. No account needed.

YOUR NEXT STEP

A clearer picture starts here.

Enter your details to see your result and next step.

Keep your installation permit and service records nearby if you have them.

Area calculation and soil loading rate

The tool divides daily design flow by an approved soil loading rate to estimate absorption area, then divides area by trench width to estimate trench length. Enter the loading rate supplied by a qualified site evaluator or permit.

Percolation time is recorded for context, but the tool does not convert minutes per inch into a loading rate. That conversion depends on jurisdiction, soil morphology, groundwater, system type, and design rules. A perc test alone is not a complete drain-field design.

Frequently asked questions

Can I size a drain field from perc time alone?

No. The approved soil loading rate and system design must be determined under local rules using a site evaluation.

Is this result a construction plan?

No. It is an arithmetic illustration and omits setbacks, trenches, distribution, reserve area, slope, and other design requirements.

Calculation details and sources

Absorption area = daily design flow ÷ approved soil loading rate. Trench length = absorption area ÷ trench width. Percolation time is captured for reference but is not converted automatically into a loading rate because the approved relationship and design rules vary by soil, state and site. Use the value from a qualified site evaluator or local permit.

Sources you can check

EPA — Septic system reports, regulations, guidance and manuals ↗
Federal overview of state and local onsite wastewater regulation · Checked 2026-11-14

EPA — How septic systems work ↗
Tank, effluent and soil absorption system components; not a state design table · Checked 2026-11-14